Solana Alpenglow
What’s new
Mainnet still returns a null getAgGenesisCert on Sep 28 — Alpenglow did not cut over. Anza research head Roger Wattenhofer said “there is no Alpenrush”; Yakovenko replied “decel” (LN 9912). Agave’s Sep 28 window remains feature-activation resume, not a labeled Alpenglow launch.
Timeline
- Sep 28, 2026No Alpenrush — mainnet genesis cert still nullWattenhofer pushback + null RPC; Sep 28 ≠ Alpenglow mainnet flip.
- Sep 27, 2026Sep 28 begins feature activation on Anza’s scheduleBegin ≠ finished; October still in Foundation target language.
- Sep 26, 2026Alpenglow hits both public testnets150 ms finality target on testnet rails ahead of the mainnet gate.
- Sep 21, 2026Agave 4.3 general adoption dayStake-quality checkpoint one week before the Sep 28 activation window.
What’s next
- Explainer: What Alpenglow actually changes — finality, genesis cert, and rumor days in plain English.
- Watch for a non-null mainnet
getAgGenesisCert/ Alpenglow genesis certificate — that is the real flip signal. - Client readiness: Agave 4.3 path vs Firedancer/Frankendancer support gaps.
- Stop when activation is confirmed with no material incidents for ~24h.
Briefing card · Explainer · Dev Pulse · Latest News · All Story Trackers
